Power Transmission Lines Projects
- 36 kV 477 MCM Soma WPP P.T.L. (power transmission line) – 11 km
- 54 kV 1272 MCM Kozbeyli WPP P.T.L. – 25 km
- 154 kV 795 MCM Samurlu WPP P.T.L. – 12.7 km
- 54 kV 1272 MCM Kuyucak WPP P.T.L. – 25 km
- 154 kV double line 1272 MCM conductive Seyitali WPP S.C. (Substation Center) – (Aliağa WPP S.C. – Viking S.C. P.T.L.)
- 154 kV 1272 MCM Poyraz WPP – Balıkesir 2 – S.C. P.T.L. - 14 km
- 154 kV 1272 MCM Poyrazgölü WPP – Dursunbey – S.C. P.T.L. - 40 km
S.C. Projects
- 154 kV Otosansit S.C. – Bursaray Feeder Primary and Secondary Projects
- 154 kV Gemlik S.C. – Gemlik Gübre Feeder Primary and Secondary Projects
Ministry of Energy Projects
- Lodos WPP Ministry of Energy; construction, mechanical and electrical projects
- Soma WPP Ministry of Energy; electrical projects
- Seyitali WPP Ministry of Energy; electrical projects
- Poyraz WPP Ministry of Energy; electrical projects
- Keltepe WPP backup power renovation projects; construction mechanical and electrical projects
- Ufuk Poyraz Lake WPP Ministry of Energy; construction, mechanical and electrical projects